Skip to content
MIT Logo

NSF ArcticMix Cruise 2015

ENDLab researchers do preliminary data collection as part of the ongoing MRV operations (monitoring, reporting, and verification) for Captura’s pilot trials of their 100-ton direct carbon capture system

  • CO2 Ongoing Field Trials 2024-2025
  • Deep-Sea Mining Field Trials 2022
  • Deep-Sea Mining Field Trials 2021
  • ONR SODA Cruise 2018
  • NSF ArcticMix Cruise 2015
MIT Mechanical Engineering
Massachusetts Institute of Technology
Massachusetts Institute of Technology

77 Massachusetts Ave, 3-347
Cambridge, MA 02139

Ph: 617-324-1569
Accessibility
MIT Logo

Massachusetts Institute of Technology
77 Massachusetts Avenue, Cambridge, MA, USA

Accessibility

  • Home
  • About
  • Research
  • People
  • News
  • Publications
  • Expeditions
  • Home
  • About
  • Research
  • People
  • News
  • Publications
  • Expeditions